Bakolori

Description

River: Sokoto
Year of commisioning: 1978
Dam height (m): 48
Volume (Hm3): 450
Lake area (Km2): 57

Comments: the plant was not working in June 2016 (information from a field mission in the country)

Metadata: HERE

Info

Size: 

Small

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

3.00MW

Connection: 

Ongrid

Current Status: 

Operational

Observatory Country: 

RE&EE Category: 

  • Hydropower
  • Small Hydropower

.