Delta - Ughelli (FGN)

Description

Most units require major overhaul.

Plant has been built in 4 phases.

Phase I: 1966 (decommissioned)

Phase II: 1975 6 x 25MW turbines (GT 2-8)

Phase III: 1978 6 x 25MW turbines (GT 9-14)

Phase IV: 1990 6 x 100MW turbines (GT 15-20). Total installed:9

Info

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

900.00MW

Connection: 

Ongrid

Current Status: 

Operational

Type: 

Observatory Country: 

.