Felou

Description

River: Senegal
Year of commisioning: 1927. It was commisioned again in 2013 after a period of refurbishments in which the installed capacity was increased from 0.6 MW to 60 MW
Dam height (m): not available
Volume (Hm3): not available
Lake area (Km2): not available

Annual production (GWh): 336

Metadata: HERE

Info

Size: 

Medium

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

60.00MW

Connection: 

Ongrid

Current Status: 

Operational

Investment Cost: 

336 509.00€

Observatory Country: 

RE&EE Category: 

  • Hydropower
  • Large Hydropower (including dam, pump and storage)

.