Gurara 2

Description

Status: under construction
River: Gurara
Expected year of commisioning: 2026
Dam Height (m): not available
Volume (Hm3): not available
Lake area (Km2): not available

Source: HERE

Info

Size: 

Large

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

360.00MW

Connection: 

Ongrid

Current Status: 

Planned

Observatory Country: 

RE&EE Category: 

  • Hydropower
  • Large Hydropower (including dam, pump and storage)

.