The Nzema Project

Info

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

155.00MW

Connection: 

Ongrid

Current Status: 

Planned

Investment Cost: 

200 000 000.00€

Type: 

Type of Contract: 

private

Observatory Country: 

RE&EE Category: 

  • Photovoltaic Power Plants Grid-Connected

.