Sapele FGN

Description

Phase I: 1978-1980 6 x 120MW Gas-fired steam turbines
Phase II: 1981 4 x 75MW gas turbines.
Most old units require major overhaul.

Info

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

1 020.00MW

Connection: 

Ongrid

Current Status: 

Operational

Type: 

Observatory Country: 

.