Tahibli

Description

Status: Under construction (more information here)

River: Cavally

Expected year of commisioning: not available

Dam height (m): not available

Volume (Hm3): not available

Lake area (Km2): not available

Metadata: HERE

Info

Size: 

Small

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

19.50MW

Current Status: 

Planned

Observatory Country: 

RE&EE Category: 

  • Hydropower
  • Small Hydropower

.