Ziga - centrale solaire photovoltaïque communautaire

Description

Commissioned in May 2017.

Funded by China (100% grant)

- KWh produced in 2017 = 1,189,249.00 (Source: SONABEL 2017)

Info

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

1.10MW

Connection: 

Ongrid

Current Status: 

Operational

Investment Cost: 

2 800 000.00€

Type: 

Observatory Country: 

RE&EE Category: 

  • Photovoltaic
  • Photovoltaic Power Plants Grid-Connected

Financial Scheme

Grant: 

100.00%

.