Sarakawa

Description
  • Expected Year of commissioning: 2020
  • Location: 22 km north-west from Kara. 4 km south-west from Sarakawa
  • River: Kara, Volta River Basin
  • Watersheed: 2,767 km2
  • Average annual discharge: 32.30 m3/s
  • Dam height: 44.5 m and 500m lenght, with a neck dam height of 10m and 760m long
  • Utilization factor: 50%
  • Maximum power: 24.2 MW
  • Turbines: 2 vertical Francis turbines with a unit capacity of 12.1 MW (93%)
  • Estimated annual production: 105,7 GWh
  • Electricity distribution: 161 kV (conditioned by the futute transmission line Kara – Dapaong). Variant: in 66 kV to Kara (27 km)
  • Cost of production works: 52.8M EUR
  • Cost of Energy Evacuation Structure: 7.7M EUR
  • Ration Million EUR / MW: 2.5
  • Investment CAPEX: 60.49M EUR
  • Estimated production cost: 0,057 EUR / kWh; 37,71 FCFA / kWh
  • Supported by: EU, AFD and the European Bank of Investment (EBI)

More info: Agence Togolaise d'Electrification Rurale et des Energies Renouvelables (AT2ER)

Info

Taille: 

Small

Capacité actuelle installée: 

24.20MW

Connexion: 

Ongrid

Situation actuel: 

Planned

Coût d'investissement: 

60 500 000.00€

Catégorie: 

Observatory Country: 

Catégorie des EnR et de l’EE: 

  • Hydroélectricité
  • Petite Hydroélectricité

.