Petite Hydroélectricité
LoffaYear of commissioning: 1958 River: ouin-ouin Operator: EDG (Eléctricité de Guinée) Source: SIE Guinée http://www.sieguinee-dne.org/index.php/cartographie.html Read More |
TungaRiver: Donga Year of commisioning: 2015 Dam height (m): not available Volume (Hm3): not available Lake area (Km2): not available Read More |
TollemacheRiver: Rafin Sanyi |
TahibliStatus: Under construction (more information here) Read More |
TagwaiRiver: Tagwai |
SamandeniDate of commissioning: November 2019 Read More |
OureeRiver: Ouree Read More |
OtukpoStatus: under construction Read More |
Ogwashi-UkuStatus: under construction |
OgbesseStatus: under construction |
NgellRiver: Kaduna Read More |
MakaliRiver: not available |
Kwall (Kwali Falls)River: Kaduna River (alternative name): Ouree |
Kwa FallsStatus: under construction |
Kurra (Kurra Falls)River: Tenti River (alternative name): Kurra |
KogingiriRiver: Kogingiri Year of commisioning: 1935 Dam height (m): 8 Volume (Hm3): 0.21 Lake area (Km2): 0.03 Comments: current installed capacity in MW is not available. Also, the exact location is unclear Read More |
Jekko 2River: Sanga |
Jekko 1River: Sanga River (alternative name): Lere Comments: location unclear Read More |
JadaStatus: Under construction River: not available Comments: capacity planned in MW not available Read More |
Ikere GorgeRiver: Ogun Metadata: HERE Read More |