Year of commissioning: 2013 (June)
Developer, owner and operator: Volta River Authority (VRA)
Off-taker: Northern Electricity Distribution Company (NEDCo)
Annual generation: 3843 MWh (2014)
Attachment | Size |
---|---|
![]() | 833.89 KB |
![]() | 3.06 MB |
Links
[1] http://www.ecowrex.org/sites/default/files/documents/eg/2012_component-project-activity-design-document_unfccc.pdf
[2] http://www.ecowrex.org/sites/default/files/documents/eg/ecreee_case_study_navrongo_solar_pv_project_ghana_0.pdf