Navrongo Solar

Description: 

Year of commissioning: 2013 (June)

Developer, owner and operator: Volta River Authority (VRA)

Off-taker: Northern Electricity Distribution Company (NEDCo)

Annual generation: 3843 MWh (2014)

Observatory Country: 

Ghana

Document: 

AttachmentSize
PDF icon CDM Mechanisms [1]833.89 KB
PDF icon ecreee_case_study_navrongo_solar_pv_project_ghana.pdf [2]3.06 MB

Owner: 

Volta River Authority (VRA)

Developer : 

Volta River Authority (VRA)

Type: 

PV Solar

Connection: 

Ongrid

Investment Cost: 

7 300 000.00€

Current Status: 

Operational

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

2.50MW

Source URL (modified on 05/31/2018 - 12:58): http://www.ecowrex.org/eg/navrongo-solar

Links
[1] http://www.ecowrex.org/sites/default/files/documents/eg/2012_component-project-activity-design-document_unfccc.pdf
[2] http://www.ecowrex.org/sites/default/files/documents/eg/ecreee_case_study_navrongo_solar_pv_project_ghana_0.pdf