The Cabeólica Wind Project comprises four small, separate wind parks on four of Cabo Verde's nine inhabited islands. The parks have a combined generation capacity of 25.5 MW and were commissioned between December 2011 and July 2012. The Investment cost of the Cabeólica wind project (4 wind parks) was approx. 60.9 million €.
Attachment | Size |
---|---|
ecreee_case_study_cabeolica_wind_project_cabo_verde_1.pdf [1] | 5.25 MB |
ecreee_estudo_de_caso_projeto_eolico_da_cabeolica_cabo_verde.pdf [2] | 5.22 MB |
Links
[1] http://www.ecowrex.org/sites/default/files/documents/eg/ecreee_case_study_cabeolica_wind_project_cabo_verde_1_0.pdf
[2] http://www.ecowrex.org/sites/default/files/documents/eg/ecreee_estudo_de_caso_projeto_eolico_da_cabeolica_cabo_verde.pdf