River: Senegal
Year of commisioning: 1927. It was commisioned again in 2013 after a period of refurbishments in which the installed capacity was increased from 0.6 MW to 60 MW
Dam height (m): not available
Volume (Hm3): not available
Lake area (Km2): not available
Annual production (GWh): 336
Metadata: HERE [1]
Links
[1] http://ecowrex.org:8080/geonetwork/srv/eng/catalog.search#/metadata/57db0a4b-e225-42d9-a493-3932824d69f8