Oyandze
Description:
It was commissioned in April 2016.
Information:
Observatory Country:
Ghana
Type:
PV Solar
Connection:
Ongrid
Investment Cost:
27 000 000.00€
Current Status:
Operational
INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants):
20.00MW