ECOWREX
Published on ECOWREX (http://www.ecowrex.org)


Port Loko (Bhanka Soka Project)

Description: 

River: Bankasoka
Year of commisioning: December 2017
Dam height (m): not available
Volume (Hm3): not available
Lake area (Km2): not available

UNIDO funded the feasibility study.

The Government of China funded the project.

Metadata: HERE [1]

Observatory Country: 

Sierra Leone

Type: 

Small Hydro

Size: 

Small

Connection: 

Ongrid

Investment Cost: 

7 700 000.00€

Grant: 

100.00%

Current Status: 

Operational

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

2.00MW

Source URL (modified on 04/11/2018 - 17:09): http://www.ecowrex.org/eg/port-loko-bhanka-soka-project

Links
[1] http://ecowrex.org:8080/geonetwork/srv/eng/catalog.search#/metadata/57db0a4b-e225-42d9-a493-3932824d69f8