Published on
ECOWREX
(
http://www.ecowrex.org
)
Nzerekore
Description:
Operateur: EDG
Year of commissioning: 2012
Groupe: 2 x 1.4MW
Observatory Country:
Guinea
Type:
Diesel
Connection:
Offgrid
Current Status:
Operational
INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants):
2.80MW
Available Capacity:
2.80MW
Source URL (modified on 02/20/2017 - 16:48):
http://www.ecowrex.org/eg/nzerekore