Published on
ECOWREX
(
http://www.ecowrex.org
)
Sunon Asogli Power Limited (SAPP) - IPP
Observatory Country:
Ghana
Type:
Gas
Connection:
Ongrid
Current Status:
Operational
INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants):
560.00MW
Available Capacity:
180.00MW
Source URL (modified on 12/13/2019 - 12:07):
http://www.ecowrex.org/eg/sunon-asogli-power-limited-sapp-ipp