Published on
ECOWREX
(
http://www.ecowrex.org
)
Cenit Energy Ltd (CEL)
Observatory Country:
Ghana
Type:
Diesel
Connection:
Ongrid
Current Status:
Operational
INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants):
110.00MW
Available Capacity:
110.00MW
Source URL (modified on 12/13/2019 - 14:40):
http://www.ecowrex.org/eg/cenit-energy-ltd-cel