Published on
ECOWREX
(
http://www.ecowrex.org
)
Alaoji NIIP
Description:
NIPP Combined cycle gas turbines 2012-2015
4 x 112,5MW turbines ( later 2 x 255MW steam turbines)
Observatory Country:
Nigeria
Type:
Gas
Connection:
Ongrid
Current Status:
Operational
INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants):
450.00MW
Source URL (modified on 12/13/2019 - 12:26):
http://www.ecowrex.org/eg/alaoji-niip