Published on
ECOWREX
(
http://www.ecowrex.org
)
Gbegamey
Description:
It is planned that AGGREKO adds 15MW more in 2017
Observatory Country:
Benin
Type:
Diesel
Connection:
Ongrid
Current Status:
Operational
INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants):
15.00MW
Source URL (modified on 03/08/2017 - 10:59):
http://www.ecowrex.org/eg/gbegamey