It was done on a commercial basis between EREN RE, AEMP (developer) and the Canadian mining company IAMGOLD ESSAKANE SA.Both the producer and the consumer are private and independent.
Observatory Country:
Burkina Faso
Type:
PV Solar
Connection:
Isolated
Investment Cost:
13 900 000.00€
Current Status:
Operational
INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants):
15.00MW
Available Capacity:
15.00MW
Source URL (modified on 02/20/2019 - 15:50): http://www.ecowrex.org/eg/essakane-solar-power-plant