Status: Under construction since February 2018
River: Konkoure
Expected year of commisioning: 2020 - 2022
Dam Height (m): not available
Volume (Hm3): not available
Lake area (Km2): not available
Project developer: TBEA (China)
Observatory Country:
Guinea
Type:
Large Hydro
Size:
Large
Connection:
Ongrid
Current Status:
Planned
INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants):
300.00MW
Source URL (modified on 02/07/2018 - 12:33): http://www.ecowrex.org/eg/amaria-tbea