Published on
ECOWREX
(
http://www.ecowrex.org
)
Gomoa Onyaadze
Description:
Year of commissioning: September 2018
- 40,800
polycrystalline silicon panels
- 400 inverters
Observatory Country:
Ghana
Type:
PV Solar
Connection:
Ongrid
Investment Cost:
26 000 000.00€
Current Status:
Operational
INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants):
20.00MW
Source URL (modified on 01/29/2019 - 11:19):
http://www.ecowrex.org/eg/gomoa-onyaadze