Published on
ECOWREX
(
http://www.ecowrex.org
)
Torankawa
Description:
Year of commissioning: February 2019
Connections:
Observatory Country:
Nigeria
Type:
PV Solar
Connection:
Ongrid
Investment Cost:
112 000.00€
Current Status:
Operational
INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants):
0.06MW
Source URL (modified on 05/09/2019 - 16:35):
http://www.ecowrex.org/eg/torankawa