ECOWREX
Published on ECOWREX (http://www.ecowrex.org)


Bor (Gardete)

Description: 

The project is promoted by SABER/ABREC and will be the biggest grid connected PV plant in Guinea Bissau. It has a capacity of 20 MW and consists of 16 units of 1,250 kW each. The plant in Bor will be financed by BOAD. [1]

Expected year of commissioning: 2020

The tender process finalized in March 2019 and it is supported by SABER-ABREC [2] - The Chinese state-owned company Sinohydro won the engineering, procurement and construction (EPC) contract

Observatory Country: 

Guinea-Bissau

Document: 

AttachmentSize
PDF icon Avis d'Appel d'Offres [3]1.16 MB

Investor: 

BOAD - Banque Ouest Africaine de Développement

Type: 

PV Solar

Connection: 

Ongrid

Grant: 

100.00%

Current Status: 

Planned

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

20.00MW

Source URL (modified on 04/15/2020 - 15:36): http://www.ecowrex.org/eg/bor-gardete

Links
[1] https://www.boad.org/
[2] http://www.saber-abrec.org/
[3] http://www.ecowrex.org/sites/default/files/documents/eg/avis_dappel_doffres.pdf