Tsatsadu Generating Station (TGS)
Description:
Year of commissioning:
2019
Owner:
Bui Power Authority
Type:
run-of-river scheme
Information:
Observatory Country:
Ghana
Owner:
BUI Power Authority
Type:
Small Hydro
Size:
Small
Connection:
Ongrid
Investment Cost:
365 000.00€
Current Status:
Operational
INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants):
0.05MW
Source URL (modified on 11/26/2019 - 12:38):
http://www.ecowrex.org/eg/tsatsadu-generating-station-tgs