Cabeólica Santiago - Monte São Filipe

Descrição

The Cabeólica Wind Project comprises four small, separate wind parks on four of Cabo Verde's nine inhabited islands. The parks have a combined generation capacity of 25.5 MW and were commissioned between December 2011 and July 2012. The Investment cost of the Cabeólica wind project (4 wind parks) was approx. 60.9 million €.

The Santiago wind farm is located in the southern region of the island, on Monte de São Filipe, on the outskirts of the city of Praia. This wind farm occupies some 30 hectares of land and contains 11 wind turbines, which corresponds to an installed capacity of 9.35 MW.

 

Key Facts

Year of commissioning: October 2011

Site: Monte São Filipe - Praia (Santiago)

Developer: Cabeólica SA

Operator: Cabeólica SA

Equipment and service provider: Vestas

 

More information HERE (Website Cabeólica)

Informações

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

9.35MW

Connection: 

Ongrid

Current Status: 

Operational

Type: 

Observatory Country: 

RE&EE Category: 

  • Sistemas eólicos ligados a rede (on-shore e off-shore)
Historical Performance

Year Capacity Available Capacity Installed Capacity Factor Annual Energy Production
2011 9.35 MW 7 727.00 MWh
2014 9.30 MW 9.35 MW 33 898.00 MWh
2015 9.28 MW 9.35 MW 31 672.00 MWh
2016 9.27 MW 9.35 MW 32 052.00 MWh
Installers
Vestas Wind Systems A/S
Developers
Cabeólica S.A.

Documentos

.