Moyamba Hydro

Descrição

Status: feasibility study finished (2016)

Expected year of commisioning: Not available

River: Gbangbaia

Dam height, gross head (m): 14.8

Q design: 140 m3/s

Average discharge of river at intake: 84,5 m3/s

Generation units: 3 Kaplan Turbines

Estimated annual production: 63.2 GWh/a

Volume (Hm3): not available

Lake area (Km2): 7,7

Developer: Smol Pawa Sierra Leone Ltd., subsidiary of Smol Pawa Energy Inc. (Canada)

Metadata: HERE

Informações

Size: 

Small

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

15.40MW

Connection: 

Ongrid

Current Status: 

Planned

Observatory Country: 

RE&EE Category: 

  • Hidroenergia
  • Mini hídrica

.