Gurara 2

Descrição

Status: under construction
River: Gurara
Expected year of commisioning: 2026
Dam Height (m): not available
Volume (Hm3): not available
Lake area (Km2): not available

Source: HERE

Informações

Size: 

Large

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

360.00MW

Connection: 

Ongrid

Current Status: 

Planned

Observatory Country: 

RE&EE Category: 

  • Hidroenergia
  • Grandes Hidroeléctricas (incluindo represa, bombagem e armazenamento)

.