Kiri

Descrição

River: Gongola

River (alternative name): Hawal
Year of commisioning: 1982
Dam height (m): 20
Volume (Hm3): 615
Lake area (Km2): 68.50

Source: HERE

 

Informações

Size: 

Medium

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

40.00MW

Connection: 

Ongrid

Current Status: 

Operational

Observatory Country: 

RE&EE Category: 

  • Hidroenergia
  • Grandes Hidroeléctricas (incluindo represa, bombagem e armazenamento)

.