Loffa

Descrição

Year of commissioning: 1958

River: ouin-ouin

Operator: EDG (Eléctricité de Guinée)

Source: SIE Guinée http://www.sieguinee-dne.org/index.php/cartographie.html

Informações

Size: 

Small

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

0.16MW

Connection: 

Isolated

Available Capacity: 

0.16MW

Current Status: 

Operational

Observatory Country: 

RE&EE Category: 

  • Mini hídrica

.