Amaria (TBEA)

Descrição

Status: Under construction since February 2018
River: Konkoure
Expected year of commisioning: 2020 - 2022
Dam Height (m): not available
Volume (Hm3): not available
Lake area (Km2): not available

Project developer: TBEA (China)

Informações

Size: 

Large

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

300.00MW

Connection: 

Ongrid

Current Status: 

Planned

Observatory Country: 

RE&EE Category: 

  • Hidroenergia
  • Grandes Hidroeléctricas (incluindo represa, bombagem e armazenamento)

.