Hidroenergia

Power Plant

Tsatsadu Generating Station (TGS)

Year of commissioning: 2019

Owner: Bui Power Authority

Type: run-of-river scheme

Information:

Read More

Sarakawa

  • Expected Year of commissioning: 2020
  • Location: 22 km north-west from Kara. 4 km south-west from Sarakawa
  • River: Kara, Volta River Basin
  • Watersheed: 2,767 km2
  • Average annual discharge: 32.30 m3/s
Read More

Amaria (TBEA)

Status: Under construction since February 2018
River: Konkoure
Expected year of commisioning: 2020 - 2022
Dam Height (m): not available
Volume (Hm3): not available
Lake area (Km2): not available

Project developer: TBEA (China)

Read More
Document

Atlas of Africa Energy Resources

Read More

Regional progress report on renewable energy, energy efficiency and energy access in the ECOWAS region - Monitoring year 2017

Read More

Rapport de Progrès Régionaux sur les Énergies Renouvelables, l'Efficacité Énergétique et l'Accès à l'Énergie dans la région de la CEDEAO

Read More

Regional progress report on renewable energy, energy efficiency and energy access in ECOWAS region - Monitoring year 2016

Read More

Guidelines for Environmental and Social Impact Assessment of Electric Power Generation and Transmission Systems in West Africa

Read More

Field Manual Current Meter Streamflow Measurement by Wading

Read More

Technical Report on Methodology and Lessons Learnt for ECOWAS Countries- GIS Hydropower Resource Mapping and Climate Change Scenarios for the ECOWAS Region

Read More

Togo Country Report- GIS Hydropower Resource Mapping and Climate Change Scenarios for the ECOWAS Region

Read More

Sierra Leone Country Report- GIS Hydropower Resource Mapping and Climate Change Scenarios for the ECOWAS Region

Read More

Senegal Country Report- GIS Hydropower Resource Mapping and Climate Change Scenarios for the ECOWAS Region

Read More

Nigeria Country Report- GIS Hydropower Resource Mapping and Climate Change Scenarios for the ECOWAS Region

Read More

Niger Country Report- GIS Hydropower Resource Mapping and Climate Change Scenarios for the ECOWAS Region

Read More

Mali Country Report- GIS Hydropower Resource Mapping and Climate Change Scenarios for the ECOWAS Region

Read More

Benin Country Report- GIS Hydropower Resource Mapping and Climate Change Scenarios for the ECOWAS Region

Read More

Liberia Country Report- GIS Hydropower Resource Mapping and Climate Change Scenarios for the ECOWAS Region

Read More
News

Transformational Partnership: Guinea Bissau starts detailed feasibility and design works on the 20 MW Saltinho Run-Off-River Hydropower Project

Under the guiding motto "NOW OR NEVER", the Guinea Bissau Sustainable Energy International Conference, held from 6 to 7 December 2018 in Bissau, had called for USD 700 million of investment. Now, another important mile-stone has been achieved. As a result of a competetive bidding process, the consortia COBA Consultores de Engenharia e Ambiete/Artelia Eau & Environnement (Portugal) was awarded with a 1,5 million Euro contract to develop a bankable feasibility study and a detailed engineering and design study on the Saltinho Run-Off-River Hydropower Project with an estimated capacity of 20 MW. The project is located in Guinea Bissau on the Corubal River, around 100 km south-east of the capital Bissau.
Read More

Liberian Hydrological Services Open Database

Since 2011, the Norwegian Water Resources and Energy Directorate is assisting the Liberian Hydrological Service in upgrading the Liberian hydrometric network. The project established 10 hydrometric stations in the principal river basins and it trained the LHS staff. After 30-years long break, the flows of Liberian rivers again are gauged and hydrological data are available to users. Continuous collection of hydrological data is particularly important for the ongoing and future hydropower studies and projects.

Read More