Power Plants
Country | Title | Capacity Installed | Generation Type | Status | Connection |
---|---|---|---|---|---|
Nigeria | TG Omotosho | Gas | Planned | Ongrid | |
Nigeria | BAKOLORI | 3.00 MW | Small Hydro | Planned | Ongrid |
Nigeria | Bakolori | 3.00 MW | Small Hydro | Operational | Ongrid |
Nigeria | Gurara 2 | 360.00 MW | Large Hydro | Planned | Ongrid |
Nigeria | IKERE GORGE | 8.00 MW | Small Hydro | Planned | Ongrid |
Nigeria | Jada | 2.00 MW | Small Hydro | Planned | |
Nigeria | Ogwashi-Uku | 2.00 MW | Small Hydro | Planned | |
Nigeria | Otukpo | 1.90 MW | Small Hydro | Planned | |
Nigeria | DADIN KOWA IPP | 34.00 MW | Medium Hydro | Planned | Ongrid |
Nigeria | Katsina Wind | 10.18 MW | Wind | Planned | Ongrid |
Nigeria | Katsina Solar | 75.00 MW | PV Solar | Planned | Ongrid |
Nigeria | Odukpani IPP-A | 561.00 MW | Gas | Operational | Ongrid |
Nigeria | Ibom Power (IPP-A) | 190.00 MW | Gas | Operational | Ongrid |
Nigeria | Alaoji NIIP | 450.00 MW | Gas | Operational | Ongrid |
Nigeria | Rivers IPP-A | 180.00 MW | Gas | Operational | Ongrid |
Nigeria | Geregu NIIP | 434.00 MW | Gas | Operational | Ongrid |
Nigeria | Olorunsogo FGN | 336.00 MW | Gas | Operational | Ongrid |
Nigeria | Ganjuwa LGA | 135.00 MW | PV Solar | Planned | Ongrid |
Nigeria | Garaku AfriNigeria | 50.00 MW | PV Solar | Planned | Ongrid |
Nigeria | KASHIMBILA | 40.00 MW | Medium Hydro | Planned | Ongrid |