Hydropower
Kurra (Kurra Falls)River: Tenti River (alternative name): Kurra |
KogingiriRiver: Kogingiri Year of commisioning: 1935 Dam height (m): 8 Volume (Hm3): 0.21 Lake area (Km2): 0.03 Comments: current installed capacity in MW is not available. Also, the exact location is unclear Read More |
Jekko 2River: Sanga |
Jekko 1River: Sanga River (alternative name): Lere Comments: location unclear Read More |
JadaStatus: Under construction River: not available Comments: capacity planned in MW not available Read More |
Ikere GorgeRiver: Ogun Metadata: HERE Read More |
GumaRiver: Guma Comments: the plant was not operational in 2016 (direct information from MoE in Sierra Leone) Read More |
Firestone (Harbel)River: Farmington |
EkitiStatus: Under construction Comment: geographical location unclear |
CharlotteRiver: not available |
Challawa GorgeRiver: Challawa Metadata: HERE Read More |
Port Loko (Bhanka Soka Project)River: Bankasoka UNIDO funded the feasibility study. The Government of China funded the project. Read More |
BakoloriRiver: Sokoto Comments: the plant was not working in June 2016 (information from a field mission in the country) Read More |
Ankwil 2 (Bagel 2)River: Tenti River (alternative name): Bagel Year of commisioning: 1963 Dam height (m): 9 Volume (Hm3): 1.16 |
Ankwil 1 (Bagel 1)River: Tenti River (alternative name): Bagel Year of commisioning: 1964 Dam height (m): 27 Volume (Hm3): 31 Lake area (Km2): 4.10 Read More |
Saltinho Phase 2The project was first evaluated by ECREEE (SKM). Read More |
OyanRiver: Oyan |
KiriRiver: Gongola |
KashimbillaStatus: under construction River: Katsina Ala |
GuraraRiver: Gurara Source: HERE Read More |