The project was first evaluated by ECREEE (SKM).
The Sustainable Energy Fund for Africa (SEFA) approved on September 16, 2015 on the sidelines of the African Development Bank’s (AfDB) Energy Week a US $965,000 grant to support the preparation of turnkey run-of-river hydropower plant with an estimated electric capacity of 20 MW at Saltinho, Guinea-Bissau. The hydropower plant will be interconnected by a transmission line to Bissau and neighbouring countries within the framework of the regional energy programme by the “Organisation for the Development of the Gambia River” (called OMVG in French), co-financed by AfDB.When completed, this regional project will boost the total installed capacity in the country, currently capped at 26 MW, lead to energy diversification and significantly decrease the average cost of production. Additionally, it will contribute to reducing the overdependence on expensive, imported diesel and heavy fuel oil, and improve the carbon footprint of the country.
Status: under construction
River: Corubal Expected year of commisioning: 2018 Dam height (m): not available Volume (Hm3): not available Lake area (Km2): not available
Metadata: HERE
Catégorie des EnR et de l’EE:
.
ECOWREX
Comission de ECOWAS
Structure
Associés
Base de donnés
Ministères de l'energie de ECOWAS
REEEP/REEGLE
REN21
Banque Africaine de développement
Banque mondiale
IRENA
IEA
JRC
Aide
Donnés de ECOWREX
Plan du site
VOS RÉACTIONS