Energy Generators
Country | Title | Capacity Installed | Generation Type | Status | Connexion |
---|---|---|---|---|---|
Nigeria | Itobe Coal | 1,200.00 MW | Coal | Planned | Ongrid |
Senegal | Centre International de Conferences Abdou Diouf (CICAD) | 2.00 MW | PV Solar | Operational | Ongrid |
Benin | Porto-Novo | 12.00 MW | Diesel | Operational | Ongrid |
Benin | Akpakpa | 35.00 MW | Diesel | Operational | Ongrid |
Burkina Faso | Ouahigouya | 5.20 MW | Diesel | Operational | Ongrid |
Burkina Faso | Komsilga | 94.00 MW | Diesel | Operational | Ongrid |
Senegal | Kounoune | 100.00 MW | Heavy Fuel | Operational | Ongrid |
Mali | Albatros | 92.00 MW | Diesel | Planned | Ongrid |
Niger | Salkadamna | 600.00 MW | Coal | Planned | Ongrid |
Niger | Zinder | 54.00 MW | Diesel | Operational | Ongrid |
Cote d Ivoire | Songon | 375.00 MW | Gas | Planned | Ongrid |
Liberia | Bushrod 2 | 18.00 MW | Heavy Fuel | Operational | Ongrid |
Liberia | Bushrod 3 | 10.00 MW | Heavy Fuel | Operational | Ongrid |
Benin | Gbegamey | 15.00 MW | Diesel | Operational | Ongrid |
Gambia | GAMWIND | 0.90 MW | Wind | Operational | Ongrid |
Nigeria | Ikere Gorge | 6.00 MW | Small Hydro | Planned | Ongrid |
Sierra Leone | Charlotte | 2.00 MW | Small Hydro | Operational | Ongrid |
Guinea | Amaria (TBEA) | 300.00 MW | Large Hydro | Planned | Ongrid |
Sierra Leone | Moyamba Hydro | 15.40 MW | Small Hydro | Planned | Ongrid |
Sierra Leone | Port Loko (Bhanka Soka Project) | 2.00 MW | Small Hydro | Operational | Ongrid |