Port Loko (Bhanka Soka Project)

Description

River: Bankasoka
Year of commisioning: December 2017
Dam height (m): not available
Volume (Hm3): not available
Lake area (Km2): not available

UNIDO funded the feasibility study.

The Government of China funded the project.

Metadata: HERE

Info

Size: 

Small

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

2.00MW

Connection: 

Ongrid

Current Status: 

Operational

Investment Cost: 

7 700 000.00€

Observatory Country: 

RE&EE Category: 

  • Hydropower
  • Small Hydropower

Financial Scheme

Grant: 

100.00%

.