Status: feasibility study finished (2016)
Expected year of commisioning: Not available
River: Gbangbaia
Dam height, gross head (m): 14.8
Q design: 140 m3/s
Average discharge of river at intake: 84,5 m3/s
Generation units: 3 Kaplan Turbines
Estimated annual production: 63.2 GWh/a
Volume (Hm3): not available
Lake area (Km2): 7,7
Developer: Smol Pawa Sierra Leone Ltd., subsidiary of Smol Pawa Energy Inc. (Canada)
Metadata: HERE