River: Senegal Year of commisioning: 1927. It was commisioned again in 2013 after a period of refurbishments in which the installed capacity was increased from 0.6 MW to 60 MW Dam height (m): not available Volume (Hm3): not available Lake area (Km2): not available
Annual production (GWh): 336
Metadata: HERE
Catégorie des EnR et de l’EE:
.
ECOWREX
Comission de ECOWAS
Structure
Associés
Base de donnés
Ministères de l'energie de ECOWAS
REEEP/REEGLE
REN21
Banque Africaine de développement
Banque mondiale
IRENA
IEA
JRC
Aide
Donnés de ECOWREX
Plan du site
VOS RÉACTIONS