Felou

Description

River: Senegal
Year of commisioning: 1927. It was commisioned again in 2013 after a period of refurbishments in which the installed capacity was increased from 0.6 MW to 60 MW
Dam height (m): not available
Volume (Hm3): not available
Lake area (Km2): not available

Annual production (GWh): 336

Metadata: HERE

Info

Taille: 

Medium

Capacité actuelle installée: 

60.00MW

Connexion: 

Ongrid

Situation actuel: 

Operational

Coût d'investissement: 

336 509.00€

Catégorie: 

Observatory Country: 

Catégorie des EnR et de l’EE: 

  • Hydroélectricité
  • Grande Hydroélectricité (Barrage, Pompage, Stockage))

.