Hydroélectricité
Tsatsadu Generating Station (TGS)Year of commissioning: 2019 Owner: Bui Power Authority Type: run-of-river scheme Information: Read More |
Sarakawa
|
Amaria (TBEA)Status: Under construction since February 2018 Project developer: TBEA (China) Read More |
Atlas of Africa Energy ResourcesRead More |
Regional progress report on renewable energy, energy efficiency and energy access in the ECOWAS region - Monitoring year 2017Read More |
Rapport de Progrès Régionaux sur les Énergies Renouvelables, l'Efficacité Énergétique et l'Accès à l'Énergie dans la région de la CEDEAORead More |
Regional progress report on renewable energy, energy efficiency and energy access in ECOWAS region - Monitoring year 2016Read More |
Guidelines for Environmental and Social Impact Assessment of Electric Power Generation and Transmission Systems in West AfricaRead More |
Field Manual Current Meter Streamflow Measurement by WadingRead More |
Technical Report on Methodology and Lessons Learnt for ECOWAS Countries- GIS Hydropower Resource Mapping and Climate Change Scenarios for the ECOWAS RegionRead More |
Togo Country Report- GIS Hydropower Resource Mapping and Climate Change Scenarios for the ECOWAS RegionRead More |
Sierra Leone Country Report- GIS Hydropower Resource Mapping and Climate Change Scenarios for the ECOWAS RegionRead More |
Senegal Country Report- GIS Hydropower Resource Mapping and Climate Change Scenarios for the ECOWAS RegionRead More |
Nigeria Country Report- GIS Hydropower Resource Mapping and Climate Change Scenarios for the ECOWAS RegionRead More |
Niger Country Report- GIS Hydropower Resource Mapping and Climate Change Scenarios for the ECOWAS RegionRead More |
Mali Country Report- GIS Hydropower Resource Mapping and Climate Change Scenarios for the ECOWAS RegionRead More |
Benin Country Report- GIS Hydropower Resource Mapping and Climate Change Scenarios for the ECOWAS RegionRead More |
Liberia Country Report- GIS Hydropower Resource Mapping and Climate Change Scenarios for the ECOWAS RegionRead More |
Transformational Partnership: Guinea Bissau starts detailed feasibility and design works on the 20 MW Saltinho Run-Off-River Hydropower Project
Under the guiding motto "NOW OR NEVER", the Guinea Bissau Sustainable Energy International Conference, held from 6 to 7 December 2018 in Bissau, had called for USD 700 million of investment. Now, another important mile-stone has been achieved. As a result of a competetive bidding process, the consortia COBA Consultores de Engenharia e Ambiete/Artelia Eau & Environnement (Portugal) was awarded with a 1,5 million Euro contract to develop a bankable feasibility study and a detailed engineering and design study on the Saltinho Run-Off-River Hydropower Project with an estimated capacity of 20 MW. The project is located in Guinea Bissau on the Corubal River, around 100 km south-east of the capital Bissau.
Read More |
Liberian Hydrological Services Open DatabaseSince 2011, the Norwegian Water Resources and Energy Directorate is assisting the Liberian Hydrological Service in upgrading the Liberian hydrometric network. The project established 10 hydrometric stations in the principal river basins and it trained the LHS staff. After 30-years long break, the flows of Liberian rivers again are gauged and hydrological data are available to users. Continuous collection of hydrological data is particularly important for the ongoing and future hydropower studies and projects. Read More |