Sheikh Mohammed Bin Zayed solar power plant

Description

Construction begun in February 2020

AMEA Power out of the United Arab Emirates is the developer of the project. In December, AMEA signed a concession agreement with the Ministry of Mines and Energies of Togo and a 25-year power purchase agreement (PPA) with La Compagnie Energie Electrique du Togo (CEET).

It will be the first utility scale renewable energy project developed by an independent power producer. It is part of the solar program being developed under the national electrification strategy through which the government intends to build four power plants in the country.

More info: HERE

Info

INSTALLED CAPACITY (operational plants) or PLANNED CAPACITY (planned plants): 

50.00MW

Connection: 

Ongrid

Current Status: 

Planned

Investment Cost: 

30 000 000.00€

Type: 

Observatory Country: 

RE&EE Category: 

  • Photovoltaic
  • Photovoltaic Power Plants Grid-Connected

.