Energy Generators
Country | Title | Capacity Installed | Generation Type | Status | Connexion |
---|---|---|---|---|---|
Nigeria | Bakolori | 3.00 MW | Small Hydro | Operational | Ongrid |
Sierra Leone | Makali | 0.64 MW | Small Hydro | Operational | |
Sierra Leone | Yele | 0.25 MW | Small Hydro | Operational | Isolated |
Guinea | Samankou | 0.41 MW | Small Hydro | Operational | Isolated |
Cote d Ivoire | FAYE (SAN PEDRO, GRAH) | 5.00 MW | Small Hydro | Operational | Ongrid |
Cote d Ivoire | Tahibli | 19.50 MW | Small Hydro | Planned | |
Liberia | Firestone (Harbel) | 4.80 MW | Small Hydro | Operational | |
Togo | Kpimé | 1.60 MW | Small Hydro | Operational | Ongrid |
Guinea | Loffa | 0.16 MW | Small Hydro | Operational | Isolated |
Nigeria | OYAN Hydro | 12.00 MW | Small Hydro | Planned | Ongrid |
Nigeria | Ikere Gorge | 6.00 MW | Small Hydro | Planned | Ongrid |
Sierra Leone | Charlotte | 2.00 MW | Small Hydro | Operational | Ongrid |
Sierra Leone | Moyamba Hydro | 15.40 MW | Small Hydro | Planned | Ongrid |
Sierra Leone | Port Loko (Bhanka Soka Project) | 2.00 MW | Small Hydro | Operational | Ongrid |
Cote d Ivoire | Ayame 2 | 30.00 MW | Small Hydro | Operational | Ongrid |
Togo | Sarakawa | 24.20 MW | Small Hydro | Planned | Ongrid |
Nigeria | Gurara | 30.00 MW | Small Hydro | Operational | Ongrid |
Sierra Leone | Guma | 2.40 MW | Small Hydro | Closed | Ongrid |
Guinea-Bissau | Saltinho Phase 2 | 20.00 MW | Small Hydro | Planned | Ongrid |
Ghana | Tsatsadu Generating Station (TGS) | 0.05 MW | Small Hydro | Operational | Ongrid |